Fishery Wharf J-9 and J-10
San Francisco, CA
We conducted a detailed structural damage survey, and provided documentation and a report for Wharf J-9/J-10, which, combined, is a timber pier structure approximately 700 ft. long. We also prepared a shoring design to provide temporary bracing and shoring of Wharf J-10 Superstructure. Under the Port’s emergency contract, we performed a study for the rehabilitation/retrofit/replacement of Wharf J-10 Fishery Pier (18,000 sf. Total area) and Wharf J-10 Superstructure (27,000 sf. Total plan area).